Projects & Updates
The latest from the Lala Builders team.
-
Kitchen Refit — Cream Gloss Units and Metro Tiles
21 October 2026
A dated galley kitchen stripped out and refitted with cream gloss handleless units, stone-effect worktops, metro-tile splashbacks and a new large-format tiled floor. Photos and a video of the fit.
-
House Extension, Part 1 — Work in Progress
9 October 2026
A single-storey rear extension under way — steels in, roof joists and rooflight openings framed, the house opened up and the liquid screed floor poured. Final photos coming soon.
-
Bathroom Refit — Wall-Hung WC and Countertop Basin
9 October 2026
A compact bathroom finished with a wall-hung toilet and concealed cistern, a countertop basin on a floating vanity, half-height tiling and a chrome towel rail. Photo and video walk-round.
-
Brickwork Repair to a Damaged Bin Store
29 August 2026
Emergency call-out to a residents' car park bin store hit by a vehicle — made safe the same day, then rebuilt to match the original brick and bond.
-
Bathroom Renovation — Before, During and After
28 August 2026
A dated, damp-stained bathroom stripped back to brick and rebuilt with a walk-in shower, new vanity and fresh tiling.
-
Kitchen Refit — Before and After
20 August 2026
A tired galley kitchen stripped back and rebuilt from scratch, from bare walls to a bright modern finish.
-
New Van, New Look for Lala Builders
9 August 2026
Our van has had a full makeover featuring our fresh logo and brand colours.